Wawasan Professional Training Centre
Construction | Engineering | Management | Information Technology
E025 Construction Bored Pile Construction And Implementation 3 Days

-
Introduction
All Session for Day 1
Introduction of Bored pile. Some basic design concept.
Works specification for bored piles. What type of site/soil conditions suitable for bored pile? Misleading Soil Investigation: Consequences?(if actual boring depth very much more/less than as shown in SI)
The different type of bored pile drilling machine and other related equipments? The scquence of bored pile construction. Different type of bored pile auger using in different soil/rock condition? The purpose and usage of temporary casing? The problem may encounter during the inserting & withdrawer of temporary casing? In what situation we need the usage of bentonite to stabilize the wall during drilling? The right method to insert reinforcement cage? How to determine the depth of borepile? How to ensure the base of the borepile is cleaned? The definition of rock in piling

All Session for Day 2
Introduction of Bored pile. Some basic design concept.
Works specification for bored piles. What type of site/soil conditions suitable for bored pile? Misleading Soil Investigation: Consequences? (if actual boring depth very much more/less than as shown in SI)
The different type of bored pile drilling machine and other related equipments? The scquence of bored pile construction. Different type of bored pile auger using in different soil/rock condition? The purpose and usage of temporary casing? The problem may encounter during the inserting & withdrawer of temporary casing? In what situation we need the usage of bentonite to stabilize the wall during drilling? The right method to insert reinforcement cage? How to determine the depth of borepile? How to ensure the base of the borepile is cleaned? The definition of rock in piling
Who are the speakers?
Qualification : Bachelor of Engineering, BE (HONS), Civil, University of Malaya, 1974.
Professional Engineer, Civil, Board of Engineers Malaysia (BEM), 1979
Member, Civil, The Institution of Engineers Malaysia (IEM), 1979
Member, Civil, The Institution of Civil Engineers (UK), 1979
Fellow, Civil, The Institution of Engineers Malaysia, 1992
BEM Accredited Independent Check Engineer, Board of Engineers Malaysia, 2004
ACEM/IEM Panel of Engineering Experts (Geotechnical), 2002
-Life Member, Road Engineering Association Malaysia, 1995

Strength : Published more than 50 technical papers about geotechnical and road engineering in various local and international conferences/seminars/journal.
Current job : Director of E-Geo Consultant Sdn. Bhd.
Biodata : Ir. Neoh has been a Vice Chairman of IEM (2004-2006), Chairman of Technical Committee on Geotechnics (TC5)of Road Association of Malaysia (1997-2006) and Chairman of IEM Geotechnical Technical Division (1996-1998),etc.

He joined JKR Malaysia for 25 years after graduated from UM in 1974. He joined IKRAM Runding Sdn Bhd as Director from 1999 to 2000. Since 2001, he is the Director of E-GEO Consultant Sdn Bhd.

He has published more than 50 technical papers about geotechnical and road engineering in various local & international conferences/seminars/journal.

He is a registered BEM Accredited Independent Checker (Geotechnical).
 
Objectives
Benefits
Sessions and Scopes
Session Scope Speaker
Session 1
Day 1
0830-0900
Registration
Session 2
Day 1
0900-1700
ALL SECTION -Day 1
Introduction of Bored pile. Some basic design concept.
Works specification for bored piles. What type of site/soil conditions suitable for bored pile? Misleading Soil Investigation: Consequences? (if actual boring depth very much more/less than as shown in SI)
The different type of bored pile drilling machine and other related equipments? The scquence of bored pile construction. Different type of bored pile auger using in different soil/rock condition? The purpose and usage of temporary casing? The problem may encounter during the inserting & withdrawer of temporary casing? In what situation we need the usage of bentonite to stabilize the wall during drilling? The right method to insert reinforcement cage? How to determine the depth of borepile? How to ensure the base of the borepile is cleaned? The definition of rock in piling
Ir. Neoh Cheng Aik
Session 3
Day 1
1000-1025
Refreshment
Session 4
Day 1
1300-1400
Lunch
Session 5
Day 1
1535-1600
Refreshment
Session 6
Day 2
0900-1700
ALL SECTION -Day 2
Introduction of Bored pile. Some basic design concept.
Works specification for bored piles. What type of site/soil conditions suitable for bored pile?
Misleading Soil Investigation: Consequences? (if actual boring depth very much more/less than as shown in SI)
The different type of bored pile drilling machine and other related equipments? The scquence of bored pile construction. Different type of bored pile auger using in different soil/rock condition? The purpose and usage of temporary casing? The problem may encounter during the inserting & withdrawer of temporary casing? In what situation we need the usage of bentonite to stabilize the wall during drilling? The right method to insert reinforcement cage? How to determine the depth of borepile? How to ensure the base of the borepile is cleaned? The definition of rock in piling
Ir. Neoh Cheng Aik
Session 7
Day 2
1000-1025
Refreshment
Session 8
Day 2
1300-1400
Lunch
Session 9
Day 2
1535-1600
Refreshment
Session 10
Day 3
0900-1700
Visit Site
Date, Time, Venue, and Fee
Date and time : 10-02-2009 (Tuesday) 0900 - 1700
11-02-2009 (Wednesday) 0900 - 1700
12-02-2009 (Thursday) 0900-1700
Venue : Setia Learning Academy, Setia Alam
Location map : See location map
Fee :
Who should attend?
Civil Engineer, Geotechnical Engineer, Structural Engineers, Building & Piling Contractors, Consultants, Project Manager, RE.
Course related information (FREE)
Additional notes
Certificate of CPD Point with full attendance
6 tea breaks & 3 lunch provided
Handout notes
Class capacity = 50